Tuzlaköy ve Serge HPP

Installed Capacity 16,66 MWe; Average Production for the Last 10 Years 27.750.000 kWh


Project Details
Project Location: ERZURUM, Oltu
Project Period: 49 Day
Power Plant Location: Erzurum, Oltu
Project Type: ENERGY